Highland Housing Fair - Plot 24
       
     
2/8
       
     
3/8
       
     
4/8
       
     
5/8
       
     
6/8
       
     
7/8
       
     
8/8
       
     
 Highland Housing Fair - Plot 24
       
     
Highland Housing Fair - Plot 24

Location / Belvonie Braes, Inverness
Client / Highland Housing Fair
Status / Completion 2010
Sector / Residential

2/8
       
     
2/8

Plot 24 at the Highland Housing Fair was won through a design competition to provide cutting edge sustainable housing. 

3/8
       
     
3/8

The two semi detached house are subdivide into three zones: rest, service and live. 

4/8
       
     
4/8

The shallow plan optimises the use of passive solar energy solutions.

5/8
       
     
5/8

Various ecological measures are inherent in the design, along with an integrated energy strategy ensuring that the house is a practical home. 

6/8
       
     
6/8

The intelligent use of local materials and standard sizes minimise waste and optimise reusability ensuring that the proposal is truly a sustainable solution.

7/8
       
     
7/8
8/8
       
     
8/8